1. Fire Safety Plan.
1. Fire Safety Plan.
2. Design & Drawing of the fire detection system, voltage drop, Battery calculation conduit Fill calculation, and Input-Output calculation as per NFPA, BNBC Guideline, with ILO, ACCORD/RSC, Alliance/ Nirapon & FSCD Requirements.
3. Design & Drawing of Fire Production (Hydrant & Sprinkler) System as per NFPA BNBC, Guidelines with ILO ACCORD/RSC & Alliance/Nirapon Requirements.
4. Supply & Installation of Fire Detection System as per NFPA-72 Standard.
5. Supply & Installation of Fire Production (Hydrant & Sprinkler) System by Following NPFA-20 Standard.
6. Supply, Installation, Testing & Commissioning of UL/FM Certified Fire Door.
7. Fire Equipment, Fire Extinguisher, Safety Shoes, Safety Helmet, Safety Sing etc.
8. Boiler Steam System, Compressed Air & Other Utility System.
9. HVAC (Heating, Ventilation and Air Conditioning) System.
10. Supply Insulation Commissioning Foam Suppression & Gas Suppression System.
11. Fire Detection System Control Panel, Diesel % Electrical Control Panel Repair, Servicing & Maintenance.
12. Fire Extinguisher Refilling.
13. Diesel Engine Over Relling Annual Maintenance.
14. Fire Safety Risk Assessment.
15. Evacuation Plan.
Maintenance of all kinds of Fire Fighting Issues.